• 0

Project Consultancy, Reports & Profiles

Best Business Opportunities in Maharashtra - Identification and Selection of right Project, Thrust areas for Investment, Industry Startup and Entrepreneurship

 

Why do Entrepreneurs Start their own Businesses? 

Starting your own business has many benefits, including being able to make your own schedule and not being answerable to anyone; you have the freedom to build your own job schedule, liberating yourself from the constricted paycheck you’ll earn at a stable job. If you start a business instead of working for a corporation that sets a maximum profit ceiling for you, you will have the freedom to explore and assert your worth on your own terms. 

In the corporate world, at no point in your career will you ever know when you will be hired or fired. When you start your own business, you can feel assured that you are making a long-term investment in your career and personal well-being.

 

Why start a Business in Maharashtra?

 

Business-Friendly Policies and Ease of Doing Business in Maharashtra: 

The state of Maharashtra has set an example of how to foster a business-friendly environment. For example, there were about 47 permits required to construct a building, which is now reduced to only eight permissions. 

Moreover, most permits and other requirements for setting up a business in Maharashtra can be filled out online, and one no longer needs to visit various government offices. This has brought transparency to the ecosystem. Also for large industries, the Maharashtra Industries Department has opened a separate office called MAITRI.

 

Market Historical Factors: 

Since the times of Tata, Birla, and Ambanis, Maharashtra has been the state of choice for most of India’s leading industrialists. The state continues to hold a favourable position to attract more investors. With its favourable industrial policies and large talent pool, Maharashtra has become a manufacturing hub. Since it is the second-largest state in India population-wise, it has a large consumer base and ranks high on the purchasing power index. Though it has some of the most well-known names in the Indian industry, its industrial policy favours the development of Small and Medium Enterprises (SMEs). Its appeal of being an ideal location is only further enhanced by the presence of industrial corridors in Nashik, Pune, Konkan, Nagpur, Aurangabad, and Amravati.

 

Infrastructure in Maharashtra: 

Maharashtra's railway network has a length of 5,987 kilometers. 9.3% of the total railway network in the country. There are 3 International airports, 7 Domestic airports, and 20 Airstrips. 99.2% of villages of the state are connected. Eighteen national highways connect the six neighbouring states & other regions. There are 2 Major Ports (JNPT & MBPT), 53 Minor Ports. JNPT is among the top 30 ports in the world, as per Lloyd’s Report.

 

Agriculture and Horticulture opportunities in Maharashtra: 

Maharashtra is a leading State in agriculture. Rice, jowar, bajra, wheat, tur, mung, urad, gram and other pulses are among the major crops grown in the state. It is a major producer of oilseeds. Groundnut, sunflower, and soybean are the major oilseed crops. Cotton, sugarcane, turmeric, and vegetables are among the most important cash crops. 

In terms of onion production, the state leads the nation. It is today emerging as a crucial horticultural State in the country. With different types of soils, diverse climate conditions, adequate technical manpower, drip irrigation facilities, and cool chain facilities, several varieties of horticulture crops are cultivated in the state. 

Grapes of finest quality produced in the state are now exported overseas. 13.66 lakh hectares of the state are planted with fruit crops such as mango, banana, orange, grape, and cashew nut.

 

Textiles: 

About 65 million kg of cotton are produced in Maharashtra, which is 25% of the country's total. Approximately 12 per cent of India's cotton yarn production comes from it, or nearly 272 million kg. 

To maintain Maharashtra's position as the country's leading exporter and producer of textiles, textile parks are being set up. The state’s critical competitive advantage in the textile industry is the abundant availability of raw material (cotton) and the large base of a skilled workforce.  

 

Chemicals, Petrochemicals, Oil & Gas: 

The state contributes 27.4 per cent to the nation's chemical, petrochemical, and oil and gas production. It also accounts for 18.2 per cent of the sector's employment in the country.  

It is the state's upstream and downstream links for raw materials and products that make it competitive in this field. A large chemical and petrochemical industry has developed in the state as a result of oil and gas found in the Bombay High field (offshore of Mumbai). The majority of the country's oil and gas comes from Bombay High.

 

Tourism in Maharashtra: 

Tourism is well recognised as a significant growth engine of the state. Maharashtra boasts a wide range of tourist attractions, such as ancient caves, temples, beaches, palaces, ancient forts and monuments, forests and wildlife, unique hill stations, pilgrimage centres, and a rich heritage of festivals, art, and culture.  

 

Mineral Resources in Maharashtra: 

The state's essential minerals include coal, iron ore, manganese, limestone, bauxite, dolomite, silica sand, kyanite and silimanite. Other minerals found include Barytes, Ilmenite, Clay, Chromite, Graphite, Fluorite, Tungsten, etc.  

 

How to Start a Business in Maharashtra? 

You must complete all legal formalities for starting your business. You should keep in mind three things when it comes to the legal formalities for starting a business in Maharashtra: the requirements, the procedure, and the documents. Below are brief descriptions of each.

The Requirements:

Private Limited Company- 

A private limited company should have at least two directors and an Indian citizen. Additionally, the number of directors cannot exceed 15. 

A Private Limited Company should have at least two shareholders but do not exceed 200.

Having your headquarters or a registered branch in an Indian city is mandatory, although you may also have offices abroad.

 

Public Limited Company- 

At least three directors and seven shareholders are required for a Public Limited Company. A valid Government identity proof and a PAN card are required for all directors. Besides these, each director of a public limited company should also have a unique identification number called Director Identification Number (DIN). 

In addition, you need to be an Indian citizen and have a registered office within an Indian city to form a Public Limited Company. All directors must have a Digital Signature Certificate (DSC), allowing them to sign documents electronically.

 

Procedures;

Starting a business in Maharashtra requires following legal steps that are part of registering a company. In most cases, registering a business involves five steps.

 

Step 1: Digital signature certificate (DSC): 

Directors of the company must have valid Digital Signature Certificates (DSCs). To register a company or business, the first step is to obtain a Digital Signature Certificate.

 

Step 2: Director Identification Number (DIN): 

A valid Director Identification Number (DIN) is also needed as a director. When incorporating your company, you will be able to apply for your DIN through DIR-3 or SPICe.

 

Step 3: Name Approval: 

You can get your company name approved by submitting the Name Approval Form or by applying for your DIN through SPICe (INC-32) during incorporation.

 

Step 4: SPICe (INC-32): 

After obtaining attestation from a legal authority, such as a Chartered Accountant, a company secretary, or a practising lawyer, you must submit the SPICe form (INC 32).

 

Step 5: The e-MoA (INC-33) and e-AoA (INC-34): 

Along with the SPICe (INC–32) form, you must also submit the e-MOA (INC-33) and the e-AoA (INC-34) forms. The registrar will assign a unique Corporate Identity Number (CIN) if you provide all the necessary documents and digitally sign them.

 

The Documents: 

The registrar will verify a set of documents before assigning the Corporate Identity Number (CIN) to a Public or Private Limited Company. The following documents are required for starting a business in Maharashtra; 

1. Directors’ PAN cards digitally signed.

2. Two passport-size photographs of each director, along with valid proofs of identity and address. 

Depending on the type of company and service provider, you will need to pay a registration fee.

 

 

AD_20Art21

Reasons for buying our reports:

• This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, market potential of the product and reasons for investing in the product

• This report provides vital information on the product like its characteristics and segmentation

• This report helps you market and place the product correctly by identifying the target customer group of the product 

• This report helps you understand the viability of the project by disclosing details like machinery required, project costs and snapshot of other project financials

• The report provides a glimpse of government regulations applicable on the industry

• The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decisions.

 

Our Approach:

• Our research reports broadly cover Indian markets, present analysis, outlook and forecast for a period of five years.

• The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players

• We use reliable sources of information and databases. And information from such sources is processed by us and included in the report



We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Honey Processing
Honey Processing

Honey is a natural product produced by honeybees and consists of a very concentrated solution of a complex mixture of ... Read More

Capacity :
1000 Kgs/ Day
Plant and Machinery cost:
16.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
126.00 Lakhs
Cost of Project :
126.00Lakhs
Add To Inquiry Basket
Paint Industry (Decorative Paint & Acrylic Emulsion Paint)
Paint Industry (Decorative Paint & Acrylic Emulsion Paint)

Paint is any liquid, liquefiable, or mastic composition that, after application to a substrate in a thin layer, conver... Read More

Capacity :
Decorative Paint:800 Kgs/Day •Acrylic Emulsion Paint:800 Kgs/Day
Plant and Machinery cost:
96.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
48.00 %
TCI :
303.00 Lakhs
Cost of Project :
303.00Lakhs
Add To Inquiry Basket
Methyl isobutyl Ketone (MIBK)from Acetone
Methyl isobutyl Ketone (MIBK)from Acetone

Methyl isobutyl ketone (MIBK) is a colorless liquid with an odor similar to mothballs. MIBK is also known as 4-methyl-2-pentanone, hexane and isopr... Read More

Capacity :
166 MT/ Day
Plant and Machinery cost:
3216.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
54.00 %
TCI :
5881.00 Lakhs
Cost of Project :
5881.00Lakhs
Add To Inquiry Basket
Readymade Garments (Jean Trousers & Shirts)
Readymade Garments (Jean Trousers & Shirts)

Readymade garments are a part of our daily life. Clothes are an epitome of a culture. People in different parts of the world have their own styles ... Read More

Capacity :
•Shirts :500 Pcs/Day•Jeans Trouser:500 Pcs/Day
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.66%
Break Even Point (BEP):
57.61 %
TCI :
247.00 Lakhs
Cost of Project :
247.00Lakhs
Add To Inquiry Basket
Copper Powder by Electrolytic Process
Copper Powder by Electrolytic Process

Copper makes vital contributions to sustaining and improving society. Copper's chemical, physical and aesthetic properties make it a material of ch... Read More

Capacity :
Copper Powder:3.33 MT/Day
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.33%
Break Even Point (BEP):
63.22 %
TCI :
321.00 Lakhs
Cost of Project :
321.00Lakhs
Add To Inquiry Basket
Masala Powder
Masala Powder

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, bulb) of plants used as a flavoring or seasoning, al... Read More

Capacity :
Red Chilli Powder:400 Kgs/Day •Sambhar Masala :400 Kgs/Day •Biryani Masala:400 Kgs/Day •Chicken F
Plant and Machinery cost:
54.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.29%
Break Even Point (BEP):
56.07 %
TCI :
239.00 Lakhs
Cost of Project :
239.00Lakhs
Add To Inquiry Basket
Bread Plant (Semi–Automatic)
Bread Plant (Semi–Automatic)

Bread is a staple foodstuff, which is made and eaten in most countries around the world. Bread products have evolved to take many forms, each based... Read More

Capacity :
Bread (400 gms):10000 Pkts/Day
Plant and Machinery cost:
52.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
69.00 %
TCI :
101.00 Lakhs
Cost of Project :
101.00Lakhs
Add To Inquiry Basket
Cattle Feed
Cattle Feed

The principal feed resources for animal consumption in the country are crop residues like straws of wheat, rice and ot... Read More

Capacity :
100 MT/Day
Plant and Machinery cost:
115.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.19%
Break Even Point (BEP):
53.57 %
TCI :
660.00 Lakhs
Cost of Project :
660.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Apple Chips
Apple Chips

Apple is one of the delicious fruits. It contains vitamins, minerals, enzyme, fruit juices etc. It is very good taste to eat fresh and its juice al... Read More

Capacity :
800 Kgs/Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
41.00 %
TCI :
533.00 Lakhs
Cost of Project :
533.00Lakhs
Add To Inquiry Basket
PVC Flex Banner (Frontlit, Backlit & Vinyl)
PVC Flex Banner (Frontlit, Backlit & Vinyl)

PVC flex is made out of PVC and fabric raw material, specially designed for solvent printing industry. It is suitable ... Read More

Capacity :
PVC Flex Banner (Frontlit/Backlit) 440 g/m2:20 MT/Day •PVC Flex Banner Vinyl 440 g/m2:5 MT/Day
Plant and Machinery cost:
550.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.14 %
TCI :
1196.00 Lakhs
Cost of Project :
1196.00Lakhs
Add To Inquiry Basket
LED Light Assembling
LED Light Assembling

A light emitting diode (LED) is a device which converts electrical energy in to light. LEDs are preferred light sources for short distance (local a... Read More

Capacity :
LED Bulbs (2.5, 5, 7 & 9 Watt Size):400 Nos/Day •LED Tubes (20 Watt Size):40 Nos/Day
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
65.00 Lakhs
Cost of Project :
65.00Lakhs
Add To Inquiry Basket
Guar Gum Powder Using Splits
Guar Gum Powder Using Splits

Guar is also called guaran, is a Galactomannan. It is primarily the ground endosperm of guar beans. The guar seeds are... Read More

Capacity :
900 MT/annum
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
303.00 Lakhs
Cost of Project :
303.00Lakhs
Add To Inquiry Basket
Automobile Tyres for Trucks, Buses and Lorries
Automobile Tyres for Trucks, Buses and Lorries

The tyre and tubes are very important rubber products and widely used everywhere in the world. The statistical production figure available from 193... Read More

Capacity :
480000 Nos./Annum
Plant and Machinery cost:
221.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
48.00 %
TCI :
1183.00 Lakhs
Cost of Project :
1183.00Lakhs
Add To Inquiry Basket
Egg Powder
Egg Powder

Egg is one of the most versatile and... Read More

Capacity :
717900 Kgs /Annum,Egg Powder: 690000 Kgs /Annum,Egg Shell Powder (bye Product): 27900 Kgs /Annum
Plant and Machinery cost:
804.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
43.00 %
TCI :
1118.00 Lakhs
Cost of Project :
1118.00Lakhs
Add To Inquiry Basket
Packaging of Tomato Paste
Packaging of Tomato Paste

Tomatoes are the most popular vegetable in the home garden. Tomatoes are widely grown in all parts of the world. They are available in a variety of... Read More

Capacity :
225 Lakh Pouches/Annum
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
308.00 Lakhs
Cost of Project :
308.00Lakhs
Add To Inquiry Basket
Granite Mining (E O U)
Granite Mining (E O U)

Granite is a common type of felsic intrusive igneous rock which is granular and phaneritic in texture. These rocks mainly consist of feldspar, quar... Read More

Capacity :
Granite: 20 Cu.mt/Day
Plant and Machinery cost:
695.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
48.00 %
TCI :
1842.00 Lakhs
Cost of Project :
1842.00Lakhs
Add To Inquiry Basket
Shrimp Farming (E O U )
Shrimp Farming (E O U )

Shrimps are swimming, decapod crustaceans classified in the infra order Caridea, found widely around the world in both fresh and salt water. Shrimp... Read More

Capacity :
Shrimp: 1.4 MT/Day
Plant and Machinery cost:
895.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
40.00 %
TCI :
3409.00 Lakhs
Cost of Project :
3409.00Lakhs
Add To Inquiry Basket
MATCH BOX (AUTOMATIC PLANT)
MATCH BOX (AUTOMATIC PLANT)

A match is a small stick of wood or strip of cardboard with a solidified mixture of flammable chemicals deposited on one end. When that end is stru... Read More

Capacity :
Match Boxes: 1000 Cases/Day
Plant and Machinery cost:
229.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
778.00 Lakhs
Cost of Project :
778.00Lakhs
Add To Inquiry Basket
Superoxide Dismutase (SOD)
Superoxide Dismutase (SOD)

Superoxide dismutases (SOD, EC 1.15.1.1) are enzymes that alternately catalyze the dismutation (or partitioning) of the superoxide (O2?) radical in... Read More

Capacity :
Superoxide Dismutase: 50 Kgs/Day
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
46.00 %
TCI :
616.00 Lakhs
Cost of Project :
616.00Lakhs
Add To Inquiry Basket
PU & PVC Leather Cloth
PU & PVC Leather Cloth

Artificial leather is a fabric or finish intended to substitute for leather in fields such as upholstery, clothing, and fabrics, and other uses whe... Read More

Capacity :
PU Leather Cloth:25000 Mtrs/Day,PVC Leather Cloth: 25000 Mtrs/Day
Plant and Machinery cost:
1338.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
2780.00 Lakhs
Cost of Project :
2780.00Lakhs
Add To Inquiry Basket
Controlled Atmosphere Cold Storage
Controlled Atmosphere Cold Storage

Controlled atmosphere (CA) storage i... Read More

Capacity :
Seasonal Commodity:11 MT/Day,Cold Storage (Rental):44 MT/Day
Plant and Machinery cost:
365.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
19.00%
Break Even Point (BEP):
45.00 %
TCI :
1022.00 Lakhs
Cost of Project :
1022.00Lakhs
Add To Inquiry Basket
Precipitated Silica from Rice Husk Ash
Precipitated Silica from Rice Husk Ash

Rice husk is an agricultural residue easily available in rice producing countries. India is a major rice producing country, and the husk generated ... Read More

Capacity :
Precipitated Silica: 5 MT/Day,CaCO3 (by product):10.3 MT/Day
Plant and Machinery cost:
437.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
55.00 %
TCI :
660.00 Lakhs
Cost of Project :
660.00Lakhs
Add To Inquiry Basket
TMT Bar
TMT Bar

Steel is a generic name for a group of ferrous metals which due to their abundance durability versatility and low cost are most useful metallic mat... Read More

Capacity :
TMT Bar: 125 MT/Day • Scraps: 6MT/Day
Plant and Machinery cost:
730.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
1675.00 Lakhs
Cost of Project :
1675.00Lakhs
Add To Inquiry Basket
RUBBER POWDER FROM WASTE TYRES
RUBBER POWDER FROM WASTE TYRES

Rubber is polymer of butadiene and one of the most important chemical ingredients, which is widely used in the different field of modern advance wo... Read More

Capacity :
Rubber Powder : 5.0 MT/day •By Product Steel Wire : 1.4 MT/day
Plant and Machinery cost:
116.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
246.00 Lakhs
Cost of Project :
246.00Lakhs
Add To Inquiry Basket
Light Liquid Paraffin Oil
Light Liquid Paraffin Oil

Light Liquid Paraffin Oil IP is highly purified mixture of liquid saturated hydrocarbons obtained from petroleum and is highly paraffinic in nature... Read More

Capacity :
10 MT/Day
Plant and Machinery cost:
1085.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
1560.00 Lakhs
Cost of Project :
1560.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Technical textiles are defined as textile materials and products used primarily for their technical performance and fu... Read More

Capacity :
96000 Pcs/Day
Plant and Machinery cost:
76.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
45.00 %
TCI :
325.00 Lakhs
Cost of Project :
325.00Lakhs
Add To Inquiry Basket
Pickles (Various Types)
Pickles (Various Types)

Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both. Pickle producing busine... Read More

Capacity :
Plant and Machinery cost:
65.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
48.00 %
TCI :
527.00 Lakhs
Cost of Project :
527.00Lakhs
Add To Inquiry Basket
Condoms
Condoms

Control of fertility continues to be an important issue through the world even though the population growth rate has shown a steady decline in many... Read More

Capacity :
116,666.7 Pcs /Day
Plant and Machinery cost:
139.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
53.00 %
TCI :
400.00 Lakhs
Cost of Project :
400.00Lakhs
Add To Inquiry Basket
Sweet & Scented Supari in Pouches
Sweet & Scented Supari in Pouches

The betel nut (Supari) tree, which is known as "ARECA" in South India. It is planted in Bengal, Mysore, Sri Lanka etc. Its yield considered being v... Read More

Capacity :
Plant and Machinery cost:
9.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
192.00 Lakhs
Cost of Project :
192.00Lakhs
Add To Inquiry Basket
Cold Storage
Cold Storage

India is the largest producer of fru... Read More

Capacity :
3000 MT
Plant and Machinery cost:
266.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
882.00 Lakhs
Cost of Project :
882.00Lakhs
Add To Inquiry Basket
Maize Processing (Glucose, Sorbitol and Oil)
Maize Processing (Glucose, Sorbitol and Oil)

Glucose is a monosaccharide (or simple sugar) also known as grape sugar, blood sugar, or corn sugar, is a very importa... Read More

Capacity :
Glucose 60 MT/Day,Sorbitol40 MT/Day, Maize Oil 12 MT/Day
Plant and Machinery cost:
5405.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
7732.00 Lakhs
Cost of Project :
7732.00Lakhs
Add To Inquiry Basket
Milk Powder (SMP, WMP and Dairy Whitener)
Milk Powder (SMP, WMP and Dairy Whitener)

Powdered milk is a dairy product produced from cow milk. Cow milk basically contains water, fats, protein sugar and ash. About 86% to 88% of cow mi... Read More

Capacity :
Skimmed Milk Powder 8.00 MT/Day • Whole Milk Powder 2.67 MT/Day • Dairy Whitener 1.50 MT/Da
Plant and Machinery cost:
387.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
973.00 Lakhs
Cost of Project :
973.00Lakhs
Add To Inquiry Basket
Precipitated Calcium Carbonate
Precipitated Calcium Carbonate

Sizing Precipitated Calcium Carbonate (PCC)—also known as purified, refined or synthetic calcium carbonate. It has the same chem... Read More

Capacity :
30 MT/Day
Plant and Machinery cost:
800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
57.00 %
TCI :
1320.00 Lakhs
Cost of Project :
1320.00Lakhs
Add To Inquiry Basket
Brake Shoe
Brake Shoe

The automobile is unique-technological achievement, which make the distance shorter. With this a far distance is covered in very short time. In dev... Read More

Capacity :
Brake Shoe (Aluminium Based):2000 NOs/Day •Brake Shoe (Mild Steel Based) : 2000 NOs/Day
Plant and Machinery cost:
49.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
148.00 Lakhs
Cost of Project :
148.00Lakhs
Add To Inquiry Basket
Alcohol from Potato
Alcohol from Potato

The term alcohol was first applied to the spirits of wine, ethyl alcohol, and now it refers to a series of substances with similar characteristics ... Read More

Capacity :
Alcohol from Potato: 60 KLs/Day
Plant and Machinery cost:
810.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
44.00 %
TCI :
2280.00 Lakhs
Cost of Project :
2280.00Lakhs
Add To Inquiry Basket
Banana Powder
Banana Powder

Banana is the common name for a type of fruit and also the herbaceous plants of the genus Musa. Banana is amongst the most versatile and most widel... Read More

Capacity :
Banana Powder: 10 MT/Day
Plant and Machinery cost:
348.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
975.00 Lakhs
Cost of Project :
975.00Lakhs
Add To Inquiry Basket
Iron Powder
Iron Powder

Iron is probably one of the most important, being used on the largest scale of any metal. Its Production in the blast furnace is well documented. W... Read More

Capacity :
3000 MT/Day
Plant and Machinery cost:
266.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
43.00 %
TCI :
882.00 Lakhs
Cost of Project :
882.00Lakhs
Add To Inquiry Basket
Grain & Potato Based Vodka Distillery
Grain & Potato Based Vodka Distillery

Vodka is a neutral spirit that is without distinctive character, aroma, taste, or color. These properties are developed during the distillation pro... Read More

Capacity :
Vodka from Grain & Potato:30 KLs/Day
Plant and Machinery cost:
3845.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
41.00 %
TCI :
6316.00 Lakhs
Cost of Project :
6316.00Lakhs
Add To Inquiry Basket
Bicycle Tubes
Bicycle Tubes

Bicycle tubes are the backbone of the bicycle industries. Few numbers of companies in organized sector are engaged in the quality grade cycles tyre... Read More

Capacity :
Bicycle Tubes: 10,000 Nos. /Day
Plant and Machinery cost:
118.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
622.00 Lakhs
Cost of Project :
622.00Lakhs
Add To Inquiry Basket
Epoxy Resin
Epoxy Resin

Read More

Capacity :
300 MT /Annum
Plant and Machinery cost:
29.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
61.00 %
TCI :
83.00 Lakhs
Cost of Project :
83.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

Sanitary Napkin comes under Nonwoven fabrics which as a whole come under technical textile.Technical textiles are defi... Read More

Capacity :
1296 Lakh Nos. /Annum
Plant and Machinery cost:
103.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
36.00 %
TCI :
980.00 Lakhs
Cost of Project :
980.00Lakhs
Add To Inquiry Basket
Cashew Processing
Cashew Processing

Cashew was introduced in India by the Portuguese four centuries ago mainly to prevent soil erosion. Cashew ranks secon... Read More

Capacity :
0
Plant and Machinery cost:
150.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
667.00 Lakhs
Cost of Project :
667.00Lakhs
Add To Inquiry Basket
Aluminium Conductors (AAAC and ACSR)
Aluminium Conductors (AAAC and ACSR)

A wire or combination or wires not insulated from one another, suitable for carrying a single electric current is called conductor. The term conduc... Read More

Capacity :
All Aluminium Alloy Conductor: 3000 MT per annum,Aluminium Conductor Steel Reinforced: 3000 MT per a
Plant and Machinery cost:
284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
731.00 Lakhs
Cost of Project :
731.00Lakhs
Add To Inquiry Basket
LPG Cylinders
LPG Cylinders

Liquefied petroleum gas (LPG) is a term describing a group of hydrocarbon-based gases derived from crude oil and or natural gas. Natural gas purifi... Read More

Capacity :
L.P.G. Cylinders (14.2 Kgs Size): 180 Nos./Day, L.P.G. Cylinders (19 Kgs Size): 180 Nos./Day
Plant and Machinery cost:
310.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
56.00 %
TCI :
547.00 Lakhs
Cost of Project :
547.00Lakhs
Add To Inquiry Basket
Textile Bleaching, Dyeing & Finishing
Textile Bleaching, Dyeing & Finishing

A textile is a flexible woven material consisting of a network of natural or artificial fibres often referred to as thread or yarn. Yarn is produce... Read More

Capacity :
Textile Bleaching Job work: 12 MT/ Day• Textile Dyeing Job work: 12 MT/ Day
Plant and Machinery cost:
109.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
5.00%
Break Even Point (BEP):
67.00 %
TCI :
3772.00 Lakhs
Cost of Project :
3772.00Lakhs
Add To Inquiry Basket
Rice Cultivation
Rice Cultivation

Rice is the leading food crop in the developing world in terms of total world production. It represents the staple food for almost two-thirds of th... Read More

Capacity :
Rice Paddy: 72500 MT/ Annum•Rice Straw as by product: 145000 MT/ Annum
Plant and Machinery cost:
1741.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
9.00%
Break Even Point (BEP):
10.00 %
TCI :
4418.00 Lakhs
Cost of Project :
4418.00Lakhs
Add To Inquiry Basket
Sodium Silicate from Rice Husk  Hull
Sodium Silicate from Rice Husk Hull

Sodium Silicate from Rice Husk/Hull

Read More

Capacity :
6000 MT/ Annum
Plant and Machinery cost:
144.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
374.00 Lakhs
Cost of Project :
374.00Lakhs
Add To Inquiry Basket
Rice Flakes from Broken Rice (used in Beer Industry)
Rice Flakes from Broken Rice (used in Beer Industry)

Rice flakes are tasty flakes that are created using rice grains. The process for creating rice flakes involves parboiling the rice, then flattening... Read More

Capacity :
20 MT/day
Plant and Machinery cost:
194.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
56.00 %
TCI :
459.00 Lakhs
Cost of Project :
459.00Lakhs
Add To Inquiry Basket
Aluminium Beverage Cans
Aluminium Beverage Cans

The aluminium beverage can is now the popular choice for carbonated and still soft drinks, mineral waters, beers and lagers. It competes successful... Read More

Capacity :
Aluminium Beverage Cans : 1,000 thousand Nos/Day
Plant and Machinery cost:
1663.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
46.00 %
TCI :
2957.00 Lakhs
Cost of Project :
2957.00Lakhs
Add To Inquiry Basket
ELECTROLYTIC MANGANESE DIOXIDE
ELECTROLYTIC MANGANESE DIOXIDE

EMD is a complex composite of various crystals of manganese and oxygen that is produced through electro-winning. It is used primarily as the active... Read More

Capacity :
Electrolytic Manganese Dioxide 5 MT Per Day
Plant and Machinery cost:
89.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
576.00Lakhs
Add To Inquiry Basket
Bleaching Powder
Bleaching Powder

Bleaching process are those which remove colour from natural or artificial products. In early times bleaching was done by mechanical means and blea... Read More

Capacity :
5 MT/Day
Plant and Machinery cost:
34.00 Lakhs
Working Capital :
14.00
Rate of Return (ROR):
59.38%
Break Even Point (BEP):
40.74 %
TCI :
75.00 Lakhs
Cost of Project :
75.00Lakhs
Add To Inquiry Basket
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant
Perfect Guide for Starting a Successful Business of Sulfur Powder Open Now Your Sulfur Powder Plant

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for Production of Ready Mix Plaster,  Block Jointer, Tile Adhesive  and M 20 Concrete (Micro Concrete)
Business Plan for Production of Ready Mix Plaster, Block Jointer, Tile Adhesive and M 20 Concrete (Micro Concrete)

 

Ready Mix Plaster is a mixture of cement paste... Read More

Capacity :
0
Plant and Machinery cost:
294.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1342.00Lakhs
Add To Inquiry Basket
Start Phosphate Rich Organic Manure (PROM) Production Business
Start Phosphate Rich Organic Manure (PROM) Production Business

 

Phosphate rice or... Read More

Capacity :
Phosphate Rich Organic Manure (PROM) 28,800 MT Per Annum
Plant and Machinery cost:
182.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
78.00 %
TCI :
0.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business
Stainless Steel Cold Rolled Coil Using Stainless Steel Scrap Manufacturing Business

Stainless steel cold rolled... Read More

Capacity :
0
Plant and Machinery cost:
2863.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
9293.00Lakhs
Add To Inquiry Basket
Setting up  Hemodialysis Blood Tubing  Business
Setting up Hemodialysis Blood Tubing Business

The introduction of hemodia... Read More

Capacity :
Homodialysis Blood Tubing Set 1,200,000 Pcs Per Annum
Plant and Machinery cost:
133.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
344.00Lakhs
Add To Inquiry Basket
Start Protein Based Nutrition Foods Production
Start Protein Based Nutrition Foods Production

 

Protein-based nut... Read More

Capacity :
Protein Based Nutrition Foods 1,200,000 Nos Per Annum (500 gms)
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
437.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash by Solvay process
A Business Plan for Soda Ash by Solvay process

 

Soda ash, also known as sodium carbonate, is a chemical compound produced when a base and an ac... Read More

Capacity :
Soda Ash (Na2CO3): 200,000 MT Per Annum, Ammonium Chloride (NH4Cl):200,000 MT Per Annum
Plant and Machinery cost:
14300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
67.00 %
TCI :
0.00 Lakhs
Cost of Project :
21000.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
A Business Plan For Sanit... Sanitary Napkins 4,800 PKTS per day 27.00 84.00
Start Manufacturing Of Bl... - 32.00 985.00
Start Production Of Potat... Potato Flakes 2 MT Per Day 25.00 563.00
Setup Manufacturing Unit ... Saddle 7,000 Unit Per Day Pedals 10,000 Unit Per Day 31.00 575.00
Opportunity in Sodium Sul... Sodium Sulfide Flakes 10,000 MT Per Annum 30.00 1426.00
Business Plan for Lithium... - 29.00 812.00
Start Manufacturing Busin... Cargo Containers (Size 20 Feet) 34 Nos Per Day 29.00 1992.00
Start Cutting and Grindin... Cutting Disc Size: (115 mm x 1 mm) 2,000 Pcs Pr Day Grinding Disc (115 mm x 6 mm) 2,000 Pcs Pr Day 28.00 423.00
Mink Blankets Production - 27.00 6000.00
A Business Plan for Micro... Micronutrient Fortified Energy Dense Food 100 MT Per Day 28.00 3500.00
Start Business of Caustic... - 25.00 56500.00
Start Crumb Rubber Powder... Crumb Rubber Powder 10 MT Per Day By Product Steel Wire 2 MT Per Day 26.00 303.00
Start Rice Milling Plant - 28.00 824.00
Start Manufacturing of Wo... Wooden Pencils 69,444 Gross Per Day 28.00 2400.00
A Business Plan for Monoc... Monocrystalline Silicon Ingots 400 Kgs Per Day 28.00 555.00
A Business Plan for Fiber... Fiberglass Tape 24,000 Mtrs. Per Day 28.00 442.00
Setup Plant of Compressed... - 28.00 950.00
Start a Production Of Com... Compressed Bio Gas 6 MT Per Day Spent Slurry as Manure 60 MT Per Day 27.00 522.00
Start Industry Of Craft B... Craft Beer (Bottles 650 ml Size) 3,847 Bottles per day Craft Beer (Al. Cans 500 ml Size) 5,000 Bot 27.00 2007.00
Setup plant of Acetate T... Acetate Tow 8 MT Per Day 29.00 1426.00
Setup Plant Of Titanium ... Titanium Dioxide 4 MT Per Day 27.00 1455.00
Setup Plant Of Lab Cultu... Lab Cultured Diamonds (1 Carat) 30 Carat Per Day 25.00 361.00
Start Lemon Processing Un... Lemon Juice Dry Powder 104 Kgs per day Lemon Peel Oil 40 Kgs per day Lemon Pectin 140 Kgs 25.00 314.00
Solar PV (Photovoltaic) G... Solar PV (Photovoltaic) Glass 90,000 MT Per Annum 28.00 4200.00
A Business Plan For Pea P... Pea Protein Isolate 2 MT Per Day Spent Pea for Cattle Feed by Product 8 MT Per Day 27.00 614.00
Setup Plant Of Acrylate... Acrylate Resins 10,000 MT Per Annum Acrylate Emulsions 10,000 MT Per Annum 30.00 2291.00
Start Latex Rubber Thread... Latex Rubber Thread 200 Kg. Per Day 26.00 412.00
Start Cosmetic Unit (Seru... - 36.00 1617.00
Pioneering Pea Protein Bu... 0 0.00 0.00
Start Production Of Silic... - 28.00 4716.00
12345678910...

Showing 721 - 780 of 3107 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR